Relating to the interconnection process; and prescribing an effective date.
1
What it does
Official summary
Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a microgrid or community microgrid. Allows a contracted third-party consultant to receive from a public utility all technical data necessary to conduct the study or engineering evaluation and submit to the public utility a preliminary design for review. Requires a public utility to approve or deny an application based on safety, reliability and compliance with published standards.
More detail
Takes effect on the 91st day following adjournment sine die.
2
Where do you stand?
Choose your position
3
Tell your reps
Take a position to see your representatives and ways to contact them.
4
More on this bill
Where it stands
Introduced
Passed House
Passed Senate
4To Governor
Became Law
Looking ahead
No hearings or votes scheduled.
History
2025
Aug 7Chapter 471, (2025 Laws): Effective date September 26, 2025.Latest