PORTS/HARBORS/TERMINALS: Expresses support for the development, construction, and long-term operation of a liquid natural gas facility at the Greater Lafourche Port Commission's Port Fourchon.
1
What it does
Plain-language analysis is being updated.
Use the official record and source text while enrichment finishes.
2
Where do you stand?
Choose your position
3
Tell your reps
Take a position to see your representatives and ways to contact them.
4
More on this bill
Where it stands
Introduced
Passed 1st Chamber
3Passed 2nd Chamber
Looking ahead
No hearings or votes scheduled.
History
2026
May 20Sent to the Secretary of State by the Secretary of the Senate.Latest
May 18Signed by the Speaker of the House.
May 14Enrolled. Signed by the President of the Senate.Minor
May 13Read by title, concurred in by vote of 90 yeas, 0 nays.
Vote recorded FINAL CONSIDERATION (#1213). Result: pass.Lower
May 13Received from the House without amendments.Minor
May 12Scheduled for floor debate on 05/13/2026.
Apr 28Read by title, passed to 3rd reading.Minor
Apr 27Reported favorably (13-0).Minor
Mar 25Read by title, under the rules, referred to the Committee on Transportation, Highways and Public Works.Minor
Mar 24Received in the House from the Senate.
Mar 24Read by title. Lies over under the rules.
Mar 23Read by title and adopted by a vote of 36 yeas and 0 nays. Ordered sent to the House.Passed 1st Chamber
Vote recorded ADOPT (#81). Result: pass.Upper
Mar 18Reported favorably.Minor
Mar 10Read second time by title and referred to the Committee on Transportation, Highways and Public Works.Minor
Mar 9Introduced in the Senate. Read by title and placed on the Calendar for a second reading.Introduced