Requires the Public Utilities Commission to establish a streamlined grid-ready homes interconnection process, including vehicle-to-grid compliance requirements, by 1/1/2026. Authorizes the use of the Hawaii electricity reliability surcharge for cost recovery of certain expenses of the Hawaii Electricity Reliability Administrator associated with the grid-ready homes interconnection process. Requires a report to the PUC on the grid-ready homes interconnection process.
More detail
Effective 1/1/2050. (SD1)
2
Where do you stand?
Choose your position
3
Tell your reps
Take a position to see your representatives and ways to contact them.
4
More on this bill
Where it stands
Introduced
2Passed Senate
3Passed House
4To Governor
5Became Law
Looking ahead
No hearings or votes scheduled.
History
2025
Feb 7Reported from EIG/CPN (Stand. Com. Rep. No. 89) with recommendation of passage on Second Reading, as amended (SD 1) and referral to WAM.Latest
Feb 7Report adopted; Passed Second Reading, as amended (SD 1) and referred to WAM.Minor
Jan 29The committee(s) on CPN recommend(s) that the measure be PASSED, WITH AMENDMENTS. The votes in CPN were as follows: 3 Aye(s): Senator(s) Keohokalole; Aye(s) with reservations: Senator(s) Fukunaga, McKelvey ; 0 No(es): none; and 2 Excused: Senator(s) Richards, Awa.Minor
Vote recorded The committee(s) on EIG recommend(s) that the measure be PASSED, WITH AMENDMENTS. Result: pass.Upper
Vote recorded The committee(s) on CPN recommend(s) that the measure be PASSED, WITH AMENDMENTS. Result: pass.Upper
Jan 29The committee(s) on EIG recommend(s) that the measure be PASSED, WITH AMENDMENTS. The votes in EIG were as follows: 3 Aye(s): Senator(s) Wakai, Chang, DeCoite; Aye(s) with reservations: none ; 1 No(es): Senator(s) Fevella; and 1 Excused: Senator(s) Richards.Minor
Jan 24The committee(s) on EIG/CPN has scheduled a public hearing on 01-29-25 9:45AM; Conference Room 229 & Videoconference.