The state must set a general permit for water and wastewater connections, with lower fees for those permits, while other permit and delegation options are authorized.
The Secretary must adopt a general permit for water and wastewater connections to new or existing structures. The Secretary may give preference to applications certified by a licensed designer.
The Secretary may adopt general permits for certain subdivisions and lot boundary changes, and for small water or wastewater systems that do not need specified variances, studies, testing, or alternative technology.
General permits for water or wastewater connections have lower fees. The act also removes a fee cap for certain water and wastewater projects in designated areas.
The Secretary may give municipalities limited review authority for qualifying connections and may let public treatment plant owners regulate certain discharges, if EPA confirms the authority is allowed.
A state advisory committee must study when required separation distances reach onto neighboring property and report on the practice, possible alternatives, and ways to address disputes.
The Secretary of Natural Resources must adopt a general permit for connections to new or existing buildings. The permit covers potable water and wastewater system connections to new or existing structures. The act has multiple effective dates beginning June 18, 2026; the summary does not specify the effective date for this requirement.
The Secretary may adopt general permits for specified land and system projects. The listed categories include certain subdivisions and boundary adjustments, plus small water and wastewater systems with design flows under 1,000 gallons per day. The act has multiple effective dates beginning June 18, 2026; the summary does not specify the effective date for this authority.
The act sets lower fees for connection permits and removes a fee cap in certain designated areas. The lower fees apply to general permits for potable water or wastewater connections. The repealed cap applied to water supply and wastewater system projects in certain designated areas; those areas are not identified in the summary. The act has multiple effective dates beginning June 18, 2026; the summary does not specify when these fee provisions take effect.
The Secretary may delegate limited technical review and treatment plant discharge oversight under stated conditions. The municipal delegation concerns technical review of qualifying connection projects. The other delegation concerns owners of publicly owned treatment works and discharges into those plants. A municipality's review role is limited to projects connecting to both municipal water and wastewater lines that the municipality owns and controls; municipal approval must include the Secretary's general permit requirements. Delegation of pretreatment discharge oversight depends on EPA notifying the Secretary that an earlier agreement allows it, and must follow federal law. The treatment plant delegation can occur only after the required EPA notice. The summary gives no specific date for either delegation authority.
The Technical Advisory Committee must report on rules that let water and wastewater separation distances reach onto neighboring land. The report must cover the technical and public health basis, environmental benefits, alternatives, data on how often the practice occurs, and steps to help resolve neighbor disputes. The committee must report to the General Assembly by January 15, 2027.
No hearings or votes scheduled.