Ohio boards of health would have limits on when they can require permits for system repairs, with exceptions for tank and soil absorption work.
Boards could not bar a sewage system on a slope if it meets state design rules and installation is safe for contractors.
Most repairs using the same or a similar part would not need a permit. Replacing a tank or changing the soil absorption part would still require one.
A board of health could not bar a sewage system on a slope if it meets state design rules and installation is safe for contractors. This applies to sewage system installations on slopes. The system must meet state design rules. Installation must not put contractors at risk.
A board of health generally could not require a permit for a repair that replaces a system part with the same or a similar part. This applies to repairs to sewage treatment systems. A permit would still be required to replace a septic tank or treatment tank, but the system would not need an upgrade if the replacement has the same type and design capacity and is approved under state standards. A permit would be required to alter or replace the soil absorption part of the system.
No hearings or votes scheduled.