Looking ahead
No hearings or votes scheduled.
History
- 2025
- Jan 15(LC) Draft Died in ProcessDied
- Jan 7(LC) Draft Delivered to Requester
- 2024
- Dec 31(LC) Draft Ready for Delivery
- Dec 28(LC) Draft in Assembly
- Dec 28(LC) Draft in Final Drafter Review
- Dec 27(LC) Draft in Input/Proofing
- Dec 26(LC) Draft in Edit
- Dec 26(LC) Draft in Legal Review
- Nov 22(LC) Drafter AssignedIntroduced