The enacted law limits local building rules for covered factory-built housing and lets cities and counties make supported changes needed to protect local health and safety.
Cities, counties, and districts may not set different or stricter building standards for covered factory-built housing than mandatory state standards. Local health and safety changes need a public finding and state filing.
Officials must favor decisions that help projects qualify as factory-built housing structures. They may decide otherwise only with written evidence of a conflict with state standards or a specific health or safety harm.
Cities, counties, and districts may not impose or enforce local building standards for covered factory-built housing that exceed or differ from mandatory state standards. A covered structure is a residential building with at least two-thirds of its new or converted area, volume, or size designated for homes, and at least 30 percent of its residential portion built using factory-built housing. A licensed design professional determines the measure, subject to agreement by the department or design approval agency. Cities and counties may change state code requirements when reasonably needed to maintain minimum health and safety because of local climate, geology, or terrain, including wildfire or flood risk. Before a change takes effect, the governing body must make a public finding and file it, along with the identified change, with the state commission. Local energy efficiency and green building amendments may not exceed state code minimums. A local health and safety change takes effect only after the finding and identified change are filed with the California Building Standards Commission.
Officials must presume that a decision helping a project qualify as a factory-built housing structure is appropriate. The presumption applies when officials interpret or apply the rules for whether a project qualifies as a factory-built housing structure. Officials may overcome the presumption only with a written finding, supported by more likely than not evidence, that the decision conflicts with a state building standard or creates a specific harmful effect on public health or safety.
No hearings or votes scheduled.